PROJECTS
MC Wells is ready to help out with all your project’s needs. We are at the forefront of the industry, always providing a wide range of professional services to clients. We guarantee reliability and quality with our work, so feel free to check out some of our latest projects and see what we can do for you too.
INSTALL CLAY SANITARY PIPE IN NORTHWEST OMAHA, NE
August, 2022
This project is in progress and includes placing more than 2,600 LF of 18" VCP sanitary sewer pipe, installing 10 manholes, and trench stabilization and erosion control measures.
INSTALL SANITARY AND STORM PIPE FOR A NEW DEVELOPMENT AT MAJESTIC BY 178TH AND STATE STREETS IN OMAHA, NE
July, 2022
This project is in progress and involves installing more than 6,200 LF of 8" sanitary pipe, more than 3,600 LF of 6" sanitary pipe, services, manholes, and 4,000 LF of RCP ranging in size from 18" to 60".
REMOVE AND REPLACE PIPE AT 14 LOCATIONS ALONG ANTELOPE CREEK IN LINCOLN, NE
April, 2022
This project involved removing and replacing more than 600 LF of storm pipe of various sizes ranging from 15" to 36", placing 140 tons of gabion stones in gabion baskets, erosion control measures, and removal and replacement of sidewalk and trail.
INSTALL SHEET PILE AND RIPRAP AROUND THE BRIDGE ON 132ND STREET SOUTH OF Q STREET IN OMAHA, NE
February, 2022
This project involved installing 960 LF of sheet pile, 132 CY of gabion stones in gabion baskets, constructing a manhole, placing 90 LF of 42" RCP, placing more than 4,200 Tons of riprap, and erosion control measures.
INSTALL SANITARY SEWER PIPE FOR REMINGTON WEST COMMUNITY IN OMAHA, NE
January, 2022
This project involved placing more than 1,400 LF of 10" sanitary sewer pipe, boring 170 LF of 10" sanitary pipe below an intersection, placing 8 manholes, placing riprap, and erosion control measures.
BOB KERREY PEDESTRIAN BRIDGE STABILIZATION IN COUNCIL BLUFFS, IA
December, 2021
This project involved clearing and grubbing the area around one of the bridge supports then placing riprap and erosion control measures.
REPLACE CULVERT AT SALT CREEK IN LINCOLN, NE
November, 2021
This project involved levee excavation, removing 50 LF of 42" CMP culvert and replacing it with 50 LF of 50" CMP culvert, and backfilling the levee. It also involved constructing concrete collars, removing and replacing flap gates and timber pile structures, and placing riprap for outlet protection.
REPLACE PANELS AND STABILIZE BANK AT 89TH AND BOYD STREETS IN OMAHA, NE
October, 2021
This project involved removing two panels that were undermined by storm water, adding riprap, replacing the two panels, then adding a new layer of riprap to each side of the panels.
REMOVE AND REPLACE EXISTING STORM SEWER IN ADAMS PARK ON 36TH AND MAPLE IN OMAHA, NE
September, 2021
This project involved removing and replacing the storm sewer, replacing the trash gate, installing flexamat erosion control, and constructing a manhole.
PLACE RIPRAP TO STABILIZE THE BANKS AROUND VARIOUS BRIDGES IN RURAL DIXON COUNTY, NE
July, 2021
This project involved placing riprap under and around various bridges to stabilize the banks then adding erosion control measures and seeding.